RPE Construction Work Plan Software

One Project.
Multiple Work Plans.
Everything Connected.

Stop rebuilding spreadsheets for every major construction activity.

Organize your project's drawings, specifications, RFIs, submittals, materials, and safety requirements once. Build detailed work plans by section and task, coordinate responsibilities, monitor preparation readiness, and produce professional field-ready documents.

Built for project managers, superintendents, and project engineers.

Stop Paying for Mistakes That Proper Planning Could Have Prevented.

Every construction mistake costs time. Crews stop, materials get replaced, work gets demolished, subcontractors return, and management scrambles to recover. A properly prepared Construction Work Plan identifies these problems before execution begins.

ChatGPT Image Nov 25 2026 12 10 46 PM 1

Wrong or Missing Materials

Crews stop and materials get replaced when nothing was verified before mobilization.

ChatGPT Image Nov 25 2026 12 10 49 PM 2

Rework From Open Questions

Unresolved RFIs and conflicting requirements turn into demolition and return trips.

ChatGPT Image Nov 25 2026 12 10 52 PM 3

No Clear Accountability

Nobody owns the preparation, so problems surface in the field instead of the office.

ChatGPT Image Nov 25 2026 12 10 54 PM 4

Hazards Found Too Late

Safety requirements and inspection hold points get discovered after the crew starts.

Reacting in the Field

Problems found after the crew is mobilized — when they cost the most to fix.

Planning Before Execution

Identify missing information, conflicting requirements, and unresolved hold points before work begins — not after the crew is in the field.

A Proven Management Practice — Made Easier to Implement

We took an established construction-management practice and built software to make it easier to implement. The business case is already proven: accident prevention, rework reduction, improved productivity, accountability, and better field coordination.

Prevent Accidents

OSHA recommends identifying hazards before work begins and at each step of the job. Job hazard analysis exists to help prevent injuries.

Reduce Cost and Variability

The Construction Industry Institute associates effective front-end planning with reduced costs, less project variability, and better project outcomes.

Avoid Rework and Delays

Construction planning research shows that identifying constraints and making tasks ready before execution improves workflow and helps avoid interruptions and rework.

The Construction Work Plan

Focused Planning Software — Not Another Enormous Platform

We're not trying to replace your construction management system. The Construction Work Plan is a focused tool that lets your project manager, superintendent, and project engineer prepare coordinated work plans without learning an enormous platform — simple enough to use on every major activity.

RPE Construction Work Plan software screen showing sections, tasks, RFIs, specs, materials and task details

See Field Readiness Before the Crew Mobilizes.

Management visibility into whether required work plans are prepared before construction starts.

An owner or operations manager can open a project and see, at a glance, which work plans are field-ready, what is still in progress, and what is missing — materials, drawings, specifications, RFIs, submittals, inspections, equipment, safety plans, personnel qualifications, and approvals.

Construction Work Plan Dashboard

No registration required. Demonstration project data.

Everything a Construction Work Plan Needs

Section-by-Section Planning

Organize the work by area, system, or sequence to match how you build.

Task Breakdowns

Turn scope into clear, actionable tasks with all the key details in one place.

Related RFIs & Specifications

Link relevant RFIs and spec sections so the field has the right information.

Material Readiness Tracking

Identify required materials and verify readiness before you mobilize.

Safety & Inspection Checkpoints

Build in safety steps, required inspections, and project hold points.

Hours-or-Days Duration Planning

Set expected durations in hours or days to keep the work on track.

How It Works

From Schedule to Work Plan

Turn your project scope into a practical, field-ready Construction Work Plan in five steps.

1

Create the Project

Set up your project and basic information.

2

Build Sections and Tasks

Organize the scope and break it into field-ready tasks.

3

Link Specs, RFIs, Materials & Safety

Attach the information your team needs to execute the work.

4

Assign Responsibilities & Durations

Define who is doing the work and how long it should take.

5

Run the Work with Fewer Surprises

Use the Work Plan to coordinate, execute, and stay ahead.

Built for Standardization, Accountability, and Better Execution

Better field coordination

Earlier material readiness

Clear accountability

More productive superintendent / PM meetings

Less last-minute scrambling

Repeatable project standards

Introductory Pricing

Choose the Right Plan for Your Team

Introductory pricing while we onboard our first contractors. Simple, contractor-focused plans — no enormous platform to learn.

Starter

Individual contractor or small project team

$49 / month
Most Popular

Contractor

General contractors and larger subcontractors

$129 / month

Enterprise

Company-wide deployment

Custom Pricing

Introductory pricing. Billed monthly. Pricing in USD.

FAQ

Common Questions about the Construction Work Plan

No. Your CPM schedule (Primavera P6 or Microsoft Project) tells you when the work happens. The Construction Work Plan defines how it gets done — the tasks, information, materials, safety steps, inspections, and responsibilities the field needs before the work starts.

Yes. Each section and task links to the RFIs and specification sections that apply, so the crew works from the right information instead of hunting for it.

Yes. It was built by a construction project manager for the people who run the work — superintendents, PMs, and project engineers — and it follows the way field teams actually plan.

Yes. Subcontractor scopes are planned in the same section-and-task format, so everyone works from one consistent plan and one standard.

No. The Construction Work Plan is a focused planning tool. Keep your existing platforms — this is where your team prepares and coordinates the work before execution.

Yes. Owners and operations managers can see which work plans are field-ready, in progress, or missing information before construction starts.

These are introductory prices while we onboard our first contractors. Request access and we will confirm your plan by email.

Make Construction Work Plans a Standard, Not an Afterthought.

See how the Construction Work Plan from Remote Project Engineer can help your team plan better, coordinate earlier, and execute with confidence.

Request a Demo

See the Work Plan on Your Project

Tell us about your team and projects. We'll follow up by email with a walkthrough built around your scope.