Terms & Conditions · Level Two
Project Engineering Support
Remote project-engineering support across six defined processes for one active project. RPE drafts, assembles, tracks and follows up; your team decides, approves and submits.
| Price | $1,000 per week |
| Initial commitment | 12 weeks — $12,000 paid in full before setup begins |
| After 12 weeks | Continues in 4-week periods ($4,000) until either party gives 14 days’ written notice |
| Included processes | Submittals, RFIs, Document Revision Control, Change Order Control, Work Plan Support, Closeout Documentation |
| Coverage | One active construction project, Monday–Friday |
Your PM keeps control. Every RFI, change package, work plan and closeout package RPE prepares is a draft for your review. RPE does not design, price, negotiate, approve or direct field work.
What’s Included
- Submittals — everything in Level One Submittal Management
- RFIs — drafted from your field notes, photos and references; logged, tracked and distributed
- Document revision control — revised sets logged, superseded sheets marked, current set maintained
- Change order control — PCO log, sub and vendor backup collected, draft proposal packages assembled
- Work plan support — current drawings, approved submittals and closed RFIs compiled into work plan packages
- Closeout documentation — closeout matrix, O&M, warranties and turnover package compiled
- Written follow-up with subs and suppliers when you authorize it, PM copied
- Weekly status visibility across all six processes
Not Included
- Engineering design, calculations or code interpretation
- Labor, material or productivity estimating; negotiating change values
- Pay applications, lien waivers, accounting or certified payroll
- CPM / P6 scheduling (see Scheduling Services)
- Live meeting attendance or recurring meeting minutes
- Procurement tracking, COI/bond compliance, daily inbox routing (Dedicated PE)
- Site visits, inspections, testing or punch walks
- Safety, OSHA, permits or authority-having-jurisdiction work
Key Terms at a Glance
- Payment clears before setup begins.
- The 12-week period starts at activation, or 10 business days after payment, whichever comes first.
- Priced for one active project and normal workload across the six processes.
- Every deliverable is a draft until your PM approves and issues it.
- RPE never speaks for you to the Owner or design team.
- Turnaround clocks pause while information is missing.
- Instructions count when they are in writing.
- No refund once project setup begins.
Full Terms
Select any section to read the complete terms.
1. Submittal Management
Includes the full Level One scope: register development, administrative pre-screen, package assembly, revision and reviewer tracking, resubmittals and final submittal record control. See the Submittal Management Terms.
2. RFI Management
- Receive a completed RFI for logging, or raw field information — notes, photos, drawing references, voice-note summaries — for drafting.
- Cross-reference the issue against drawings, specifications, approved submittals and related records.
- Draft the RFI narrative, organize exhibits and stage the package for Client review.
- Track turnaround, response status and aging, and distribute closed answers to affected parties when authorized.
Any proposed solution in an RFI drafted by RPE is an administrative statement of direction supplied by the Client. It is not engineering design or professional advice.
3. Document Revision Control
- Receive revised drawings, addenda, bulletins, ASIs and sketches.
- Identify changed sheets, archive superseded versions and maintain the current set.
- Update the drawing register or revision log.
- Issue authorized electronic transmittals to affected subs and vendors and track acknowledgments.
4. Change Order Control
- Open and maintain the administrative record for potential changes identified by the Client.
- Collect subcontractor and vendor quotations and backup under Client authorization.
- Organize pricing backup, recaps and Client-supplied markups into a controlled proposal package.
- Prepare draft PCO and change-order documentation and maintain the status log.
RPE does not estimate labor, quantities or productivity, determine entitlement, negotiate, approve costs or commit the Client to a commercial position.
5. Work Plan Support & Control
- Compile current drawing excerpts, approved submittals, closed RFIs, specifications and Client-supplied sequence information into a pre-task work plan package.
- Maintain the work plan register and revision status, and flag missing documents or open questions.
- Distribute approved work plans and revisions to the field team when authorized.
The Project Manager and Superintendent remain responsible for means and methods, sequencing, safety, manpower and field execution.
6. Closeout Documentation & Control
- Build a closeout matrix from the contract requirements.
- Track O&M manuals, warranties, certifications, training records, as-builts, test and startup records, spare parts and attic stock.
- Request and follow up on missing closeout documents when authorized.
- Compile digital closeout packages for Client review and final submission.
RPE does not certify completion or installed work, sign affidavits, approve retainage release or represent that the Owner will accept the package.
7. Turnaround Targets
| Deliverable | Target |
|---|
| Routine submittal or RFI package | 24–48 business hours after complete intake |
| Routine revision slip-sheet and transmittal (fewer than 25 sheets) | 24–48 business hours |
| Large drawing-set revision | 3–5 business days |
| Change proposal package | 48 business hours after all quotes and backup are received |
| Pre-task work plan package | 5 business days’ notice before planned field use |
| Initial submittal register or closeout matrix | 3–5 business days after complete intake |
Targets are not guaranteed deadlines and pause while information is missing. Same-day, after-hours, weekend and holiday requests require RPE’s written acceptance and any expedited fee stated in advance.
8. Capacity and Fair Use
The service is priced for one active project and normal administrative throughput across the six processes. It is not a fixed number of hours or unlimited volume. RPE may require an additional project subscription, scope amendment or upgrade to Dedicated Project Engineer for multiple concurrent projects, extraordinary document surges or sustained workload materially beyond normal.
9. Client Responsibilities
- Provide current drawings, specifications, revisions and project procedures.
- Provide timely field facts, photos, dimensions, quotes, need dates and approvals.
- Maintain RPE’s access to the agreed project platform.
- Review every RPE-prepared document before submission, commercial use or field execution, and make all final technical, pricing, schedule, safety and field decisions.
10. Fees and Term
$1,000 per week with a 12-week minimum. The initial fee of $12,000 is due and must clear before mobilization. After the initial term the service continues in 4-week periods billed in advance at $4,000 until either party gives written notice under the Service Agreement. Fees are not reduced for rain days, shutdowns, permit holds, design delays or reduced project activity.
11. Service Agreement Terms
Payment, activation, renewal and cancellation, refunds, written-first communication, confidentiality, records, warranty, limitation of liability, waiver of project-impact damages, indemnity and governing law are set out in the RPE Service Agreement, which applies to this service.
Start Project Support
Effective November 28, 2026. These Service Terms are part of the RPE Service Agreement, which also applies to every order.