Project Engineering Support

Remote project-engineering support across six defined processes for one active project. RPE drafts, assembles, tracks and follows up; your team decides, approves and submits.

Price$1,000 per week
Initial commitment12 weeks — $12,000 paid in full before setup begins
After 12 weeksContinues in 4-week periods ($4,000) until either party gives 14 days’ written notice
Included processesSubmittals, RFIs, Document Revision Control, Change Order Control, Work Plan Support, Closeout Documentation
CoverageOne active construction project, Monday–Friday
Your PM keeps control. Every RFI, change package, work plan and closeout package RPE prepares is a draft for your review. RPE does not design, price, negotiate, approve or direct field work.

What’s Included

Not Included

Key Terms at a Glance

Full Terms

Select any section to read the complete terms.

1. Submittal Management

Includes the full Level One scope: register development, administrative pre-screen, package assembly, revision and reviewer tracking, resubmittals and final submittal record control. See the Submittal Management Terms.

2. RFI Management
  • Receive a completed RFI for logging, or raw field information — notes, photos, drawing references, voice-note summaries — for drafting.
  • Cross-reference the issue against drawings, specifications, approved submittals and related records.
  • Draft the RFI narrative, organize exhibits and stage the package for Client review.
  • Track turnaround, response status and aging, and distribute closed answers to affected parties when authorized.

Any proposed solution in an RFI drafted by RPE is an administrative statement of direction supplied by the Client. It is not engineering design or professional advice.

3. Document Revision Control
  • Receive revised drawings, addenda, bulletins, ASIs and sketches.
  • Identify changed sheets, archive superseded versions and maintain the current set.
  • Update the drawing register or revision log.
  • Issue authorized electronic transmittals to affected subs and vendors and track acknowledgments.
4. Change Order Control
  • Open and maintain the administrative record for potential changes identified by the Client.
  • Collect subcontractor and vendor quotations and backup under Client authorization.
  • Organize pricing backup, recaps and Client-supplied markups into a controlled proposal package.
  • Prepare draft PCO and change-order documentation and maintain the status log.

RPE does not estimate labor, quantities or productivity, determine entitlement, negotiate, approve costs or commit the Client to a commercial position.

5. Work Plan Support & Control
  • Compile current drawing excerpts, approved submittals, closed RFIs, specifications and Client-supplied sequence information into a pre-task work plan package.
  • Maintain the work plan register and revision status, and flag missing documents or open questions.
  • Distribute approved work plans and revisions to the field team when authorized.

The Project Manager and Superintendent remain responsible for means and methods, sequencing, safety, manpower and field execution.

6. Closeout Documentation & Control
  • Build a closeout matrix from the contract requirements.
  • Track O&M manuals, warranties, certifications, training records, as-builts, test and startup records, spare parts and attic stock.
  • Request and follow up on missing closeout documents when authorized.
  • Compile digital closeout packages for Client review and final submission.

RPE does not certify completion or installed work, sign affidavits, approve retainage release or represent that the Owner will accept the package.

7. Turnaround Targets

DeliverableTarget
Routine submittal or RFI package24–48 business hours after complete intake
Routine revision slip-sheet and transmittal (fewer than 25 sheets)24–48 business hours
Large drawing-set revision3–5 business days
Change proposal package48 business hours after all quotes and backup are received
Pre-task work plan package5 business days’ notice before planned field use
Initial submittal register or closeout matrix3–5 business days after complete intake

Targets are not guaranteed deadlines and pause while information is missing. Same-day, after-hours, weekend and holiday requests require RPE’s written acceptance and any expedited fee stated in advance.

8. Capacity and Fair Use

The service is priced for one active project and normal administrative throughput across the six processes. It is not a fixed number of hours or unlimited volume. RPE may require an additional project subscription, scope amendment or upgrade to Dedicated Project Engineer for multiple concurrent projects, extraordinary document surges or sustained workload materially beyond normal.

9. Client Responsibilities
  • Provide current drawings, specifications, revisions and project procedures.
  • Provide timely field facts, photos, dimensions, quotes, need dates and approvals.
  • Maintain RPE’s access to the agreed project platform.
  • Review every RPE-prepared document before submission, commercial use or field execution, and make all final technical, pricing, schedule, safety and field decisions.
10. Fees and Term

$1,000 per week with a 12-week minimum. The initial fee of $12,000 is due and must clear before mobilization. After the initial term the service continues in 4-week periods billed in advance at $4,000 until either party gives written notice under the Service Agreement. Fees are not reduced for rain days, shutdowns, permit holds, design delays or reduced project activity.

11. Service Agreement Terms

Payment, activation, renewal and cancellation, refunds, written-first communication, confidentiality, records, warranty, limitation of liability, waiver of project-impact damages, indemnity and governing law are set out in the RPE Service Agreement, which applies to this service.

Start Project Support

Effective November 28, 2026. These Service Terms are part of the RPE Service Agreement, which also applies to every order.