The financial and operational case for taking submittal administration off your project manager’s desk.
Construction submittals services are becoming an option worth evaluating for general contractors and specialty subcontractors facing increasing administrative workloads.
The question is not whether submittals are necessary. Every experienced contractor understands their importance.
The question is whether the person responsible for managing the construction project should also be responsible for building registers, contacting vendors, assembling packages, tracking architect reviews, processing revisions, and maintaining every administrative record.
For many contractors, the answer has traditionally been simple: assign the work to the project engineer or project manager.
That arrangement may work when the workload is limited. But as project volume increases, submittal administration can consume time needed for procurement decisions, subcontractor coordination, cost control, and construction planning.
Before hiring another employee, contractors should understand what their submittal workload actually costs and whether selected responsibilities can be outsourced.
1. The Hidden Cost of Managing Submittals Internally
Most contractors do not maintain a separate accounting category for every hour spent managing construction submittals.
The cost is absorbed into project management salaries, project engineering positions, and general administrative overhead.
A project manager may spend time reviewing incoming correspondence, following up on missing product data, requesting overdue submittals, organizing revision packages, and updating project registers.
Each responsibility appears relatively small.
Together, they may represent a significant recurring workload.
Consider a hypothetical commercial construction project with 180 required submittals.
Some packages may be straightforward product data. Others may contain extensive shop drawings, certifications, test information, or multiple revisions.
The administrative burden depends on far more than the initial number of submissions.
The total workload includes receiving documents, checking completeness, organizing contractor reviews, transmitting authorized packages, recording review comments, tracking outstanding responses, and maintaining accepted records.
A single item requiring three resubmissions can demand substantially more administrative attention than one accepted during its initial review.
The true cost of in-house submittal management is the time required to maintain the complete process—not simply the number of documents submitted.
2. What Does Construction Management Labor Cost?
Construction project management is skilled professional work.
According to the U.S. Bureau of Labor Statistics, the national median annual wage for construction managers was $114,990 in May 2025.
That figure represents wages, not the full employer cost of maintaining the position.
Contractors may also incur expenses for payroll taxes, employee benefits, recruiting, onboarding, software, equipment, and supervision.
Source: U.S. Bureau of Labor Statistics — Construction Managers
However, this wage benchmark requires an important qualification.
A construction manager and a submittal administrator do not perform equivalent jobs.
It would be misleading to compare a construction manager’s annual salary with the price of a specialized administrative service and describe the entire difference as savings.
The more useful comparison is the actual cost of performing defined administrative responsibilities under each staffing arrangement.
For example, a contractor should determine how many hours its existing employees spend performing submittal administration and whether those hours could be redirected toward higher-priority responsibilities.
If the contractor is considering hiring another employee specifically to handle the workload, the comparison should also consider that position’s expected duties, compensation, and capacity.
This provides a more realistic basis for evaluating construction submittals services.
3. Three Ways Contractors Can Staff Submittal Administration
Most contractors have three practical staffing options.
Option One — Assign the Work to Existing Personnel
The contractor’s current project manager or project engineer handles the submittal workload.
This approach may be appropriate when the project has relatively few submissions and employees have sufficient capacity.
The primary advantage is that the existing team already understands the project.
The disadvantage is that administrative work competes with construction management responsibilities.
If an experienced project manager spends substantial time maintaining registers and chasing vendors, that time is unavailable for other project activities.
Option Two — Hire Additional Project Administration Staff
The contractor recruits another project engineer, coordinator, or administrative employee.
This may be appropriate when the company has consistent work across multiple projects.
An internal employee can support additional duties beyond submittals and become familiar with the contractor’s operating systems.
However, the contractor assumes the continuing cost of employment, even when project workloads decline.
Recruiting, onboarding, management, equipment, and software also require attention.
Option Three — Outsource Defined Construction Submittals Services
The contractor engages a provider to perform specified administrative responsibilities.
These may include register development, vendor coordination, package organization, formal review tracking, revision control, and reporting.
The project manager retains management authority and technical decision-making responsibilities.
The provider handles the agreed administrative production.
This approach may be appropriate when a contractor needs additional project capacity without immediately expanding permanent staffing.
The advantage depends on the service being properly defined, supervised, and measured.
4. What Does Outsourced Submittal Management Actually Cost?
Remote Project Engineer offers a defined construction submittal management service for U.S. contractors.
The standard commercial structure is:
| Service | Price |
|---|---|
| Submittal Management | $400 per week |
| Initial engagement | 12 weeks |
| Initial contract value | $4,800 |
| Project coverage | One project, defined service scope |
The service is designed to support the administrative submittal process rather than replace the contractor’s project manager.
Its responsibilities include maintaining the register, coordinating authorized vendor follow-up, organizing documentation, conducting administrative completeness checks, tracking reviews and resubmittals, monitoring outstanding approvals, and reporting status to the project manager.
The $400 weekly charge should not be interpreted as purchasing an unlimited number of project engineering hours.
It purchases defined administrative support within the agreed engagement.
For the complete service description, visit:
Remote Project Engineer — Construction Submittals Services
5. Comparing the Financial Scenarios
A practical comparison should begin with the contractor’s existing workload and staffing situation.
The following example is hypothetical and is not a guaranteed savings calculation.
Assume a contractor estimates that its project manager spends eight hours each week on routine submittal administration.
Assume further that the contractor uses an internal planning value of $75 per hour for that employee’s time, including the costs the company chooses to allocate to that position.
Under those assumptions:
| Illustrative cost component | Weekly value | 12-week value |
|---|---|---|
| Eight PM hours at $75/hour | $600 | $7,200 |
| RPE Submittal Management fee | $400 | $4,800 |
| Difference in assigned cost | $200 | $2,400 |
The $2,400 difference is not automatically a cash saving.
The contractor still pays its project manager unless staffing or other expenses actually change.
Furthermore, the contractor will retain technical review, coordination, and management responsibilities after outsourcing.
The table illustrates a comparison between an assumed internal allocation of time and an external service fee. It does not establish that the external provider performs identical work or eliminates all eight internal hours.
The actual value comes from determining how much administrative work can genuinely be transferred and what the contractor accomplishes with the capacity recovered.
If that recovered time allows the PM to address procurement problems, manage subcontractor commitments, control changes, or oversee another project more effectively, the arrangement may provide operational value.
If the project manager has unused capacity or most of the work still requires internal review, the financial justification may be weaker.
This distinction matters because outsourcing should be evaluated as a management decision—not marketed as automatic salary savings.
6. Five Benefits of Outsourcing Construction Submittals Services
1. More Project Management Capacity
Delegating register maintenance, administrative follow-up, and package tracking can reduce the routine workload carried by project management personnel.
The PM retains responsibility for the project while gaining time for decisions requiring direct management involvement.
2. More Consistent Submittal Tracking
A maintained register identifies outstanding packages, current review status, responsible parties, and required follow-up.
This helps prevent unresolved items from being overlooked as project demands increase.
3. Better Visibility Into Procurement Risks
A submittal delay can become a procurement problem when approval is necessary before fabrication or material release.
Tracking outstanding approvals against procurement milestones can help the contractor recognize schedule concerns earlier.
Administrative tracking does not guarantee timely approval, but it provides information needed for management action.
4. Controlled Revision and Resubmittal Records
Returned packages require documented corrections, revision control, and additional review.
An organized administrative process reduces uncertainty over which version is current and where a package stands in the review cycle.
5. Defined Administrative Cost
A fixed service fee makes the direct price of the agreed administrative support easier to identify.
That can be valuable when the contractor faces temporary increases in project volume or wants to avoid immediately adding permanent administrative staff.
The benefit still depends on the actual scope, workload, and internal responsibilities retained.
7. Construction Submittals Services for Federal and Military Contractors
Federal construction projects may impose additional submittal requirements through Division 01 and the applicable contract specifications.
For example, Unified Facilities Guide Specification Section 01 33 00 establishes procedures for construction submittals on projects where that specification is incorporated into the contract.
Such requirements can affect register development, review classifications, package preparation, transmittals, review responsibilities, and document records.
Contractors must follow the requirements applicable to their particular project.
For government construction, an outside submittal administrator may support the process by maintaining required records, organizing packages, tracking review status, and coordinating authorized administrative follow-up.
However, outsourcing does not transfer the contractor’s quality-control responsibilities or government approval authority.
That boundary is especially important for federal construction.
The administrative provider can manage the workflow while the contractor’s responsible personnel perform the reviews, certifications, and decisions required under the contract.
Technical reference:
UFGS 01 33 00 — Submittal Procedures
8. When Outsourcing May Not Be the Right Decision
There are circumstances where outsourcing construction submittals services may provide little benefit.
A small project with a limited number of simple submissions may not justify a separate service arrangement.
An existing project engineer may already have sufficient time to manage the process.
A complex package may require extensive technical coordination that cannot be transferred to an administrative provider.
Contract requirements may also impose specific restrictions on access, systems, correspondence, reviews, or designated personnel.
Before engaging a provider, contractors should confirm that the proposed service fits the actual project requirements.
A properly defined outsourcing arrangement should reduce unnecessary workload—not introduce more coordination requirements than it eliminates.
9. What Contractors Should Demand From a Submittal Service Provider
The right questions go beyond pricing.
Who builds the register? Who is responsible for reviewing the specifications? How are vendor follow-ups documented?
Who performs the contractor’s technical review? How are missing documents handled? How are overdue design-team reviews reported?
What records will the project manager receive, and how often?
Which software platform will be used?
Most importantly, what does the provider handle—and what remains the contractor’s responsibility?
A professional provider should be able to explain those boundaries before the engagement begins.
The contractor should also establish the expected volume of work, reporting requirements, turnaround expectations, and procedures for unusual backlogs or additional services.
This protects both parties and makes performance easier to evaluate.
10. From Educational Research to a Practical Staffing Decision
The decision to outsource construction submittals services is part of a broader question facing U.S. construction companies.
How much of the project management workload requires internal authority, and how much can be organized into defined administrative support functions?
Remote Project Engineer has published a detailed research paper exploring that distinction.
The paper examines staffing costs, administrative responsibilities, outsourcing benefits, potential risks, and implementation considerations.
Read the complete educational research:
Outsourcing Construction Management: Costs, Benefits, Risks & Best Practices
The research provides additional context for contractors comparing permanent employment with outsourced construction administration.
Conclusion: Outsource the Administrative Work, Not the Project Responsibility
Construction submittals are not optional paperwork.
They establish a documented process connecting design requirements, materials, equipment, procurement, reviews, and construction records.
Someone must manage that process.
The question is whether those responsibilities should remain entirely with existing project personnel, justify another employee, or be assigned to a defined outside administrative service.
Construction submittals services may provide value when they relieve the project manager of routine administrative responsibilities while preserving the contractor’s authority and technical obligations.
The financial decision should be based on actual project workload, retained responsibilities, service cost, and the useful capacity recovered.
Your project manager should be managing the construction project—not personally chasing every piece of paperwork behind it.
Explore Remote Project Engineer’s Submittal Management Services
RPE provides construction submittal management beginning at $400 per week, with a 12-week initial engagement.
Review the complete scope, responsibilities, and commercial terms:
CONSTRUCTION SUBMITTALS SERVICES — REMOTE PROJECT ENGINEER
References
U.S. Bureau of Labor Statistics — Construction Managers, Occupational Outlook Handbook. May 2025 wage data.
https://www.bls.gov/ooh/management/construction-managers.htm
Whole Building Design Guide — Unified Facilities Guide Specification 01 33 00, Submittal Procedures.
https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2033%2000.pdf
Remote Project Engineer — Construction Submittals Services.
https://remoteprojectengineer.com/construction-submittals-services/
Remote Project Engineer — Outsourcing Construction Management: Costs, Benefits, Risks & Best Practices.
https://remoteprojectengineer.com/outsourcing-construction-management/